欢迎您访问天津市数字贸易综合服务平台!
当前位置 : 首页 > 市场合作 > 项目信息

市场合作

Market cooperation
项目信息
发包方名称 Kenya National Highways Authority
发包方国别(国家/地区) 肯尼亚
发包方座机
发包方传真
发包方邮箱 procurement@kenha.co.ke
发包方地址
发包方网址 www.kenha.co.ke
发包方联系人姓名
发包方联系人座机
发包方联系人手机
发包方联系人邮箱
项目名称 routine maintenance & spot improvement of mrima/malambashimba hills-mwabungu (b98) road.
项目类型 工程技术服务 - 工程技术服务
项目预算¥
项目投标截止时间 2022-06-01
项目开始时间 2022-06-01
项目结束时间 2022-06-01
服务商资质要求
要求高匹配度成功案例个数
项目交付地点
是否准许转包或分包
项目信息详述
PREAMBLE TO BILL OF QUANTITIES
1. The Bills of Quantities shall be read in conjunction with the Instructions to Tenderers,
General and Particular Conditions of Contract, Technical Specifications, and Drawings.
2. The quantities given in the Bills of Quantities are estimated and provisional, and are given
to provide a common basis for tendering. The basis of payment will be the actual quantities
of work ordered and carried out, as measured by the Contractor and verified by the Engineer
and valued at the rates and prices tender in the priced Bills of Quantities, where applicable,
and otherwise at such rates and prices as the Engineer may fix within the terms of the
Contract.
3. The rates and prices tender in the priced Bills of Quantities shall, except in so far as it is
otherwise provided under the Contract, include all Constructional Plant, labor, supervision,
materials, erection, maintenance, insurance, profit, taxes, and duties, together with all
general risks, liabilities, and obligations set out or implied in the Contract.
4. A rate or price shall be entered against each item in the priced Bills of Quantities, whether
quantities are stated or not. The cost of Items against which the Contractor has failed to
enter a rate or price shall be deemed to be covered by other rates and prices entered in the
Bills of Quantities.
5. The whole cost of complying with the provisions of the Contract shall be included in the
Items provided in the priced Bills of Quantities, and where no Items are provided, the cost
shall be deemed to be distributed among the rates and prices entered for the related Items of
Work.
6. General directions and deions of work and materials are not necessarily repeated nor
summarized in the Bills of Quantities. References to the relevant sections of the Contract
documentation shall be made before entering prices against each item in the priced Bills of
Quantities.
7. Provisional Sums included and so designated in the Bills of Quantities shall be expended in
whole or in part at the direction and discretion of the Engineer in accordance with SubClause 13.5 and Clause 13.6 of the General Conditions.
8. The method of measurement of completed work for payment shall be in accordance with
general and special specifications.
The price and rates entered in the Bills of Quantities shall, except insofar as it is otherwise provided
under the Contract, include all Constructional plant to be used, labour, insurance, supervision,
compliance testing, materials, erection, maintenance of works, overheads and profits, taxes and duties
together with all general risks, liabilities and obligations set out or implied in the Contract, transport,
electricity and telephones, water, use and replenishment of all consumables, including those required
under the contract by the Engineer and his staff.
联系人:高杨
手机:+86-131-1480-9286
邮箱:gloria.gao@devott.com
微信:13114809286
联系人:张金铭
手机:+86-152-2270-5844
邮箱:angel.zhang@devott.com
微信:15222705844
微信二维码

扫描上方二维码添加联系人咨询

微信二维码

扫描上方二维码添加联系人咨询

版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9

在线咨询

电话咨询

微信咨询