欢迎您访问天津市数字贸易综合服务平台!
当前位置 : 首页 > 市场合作 > 项目信息

市场合作

Market cooperation
项目信息
发包方名称 Office of Public Works (OPW)
发包方国别(国家/地区) 爱尔兰
发包方座机
发包方传真
发包方邮箱
发包方地址 Jonathan Swift Street Co. Meath, C15 NX36 Trim Ireland
发包方网址
发包方联系人姓名 Office of Public Works (OPW)
发包方联系人座机 +353 469426000
发包方联系人手机
发包方联系人邮箱
项目名称 ARP2022MC - Archival Repository Project - Main Contractor
项目类型 其他 - 其他
项目预算¥
项目投标截止时间 2022-05-06
项目开始时间
项目结束时间
服务商资质要求
要求高匹配度成功案例个数
项目交付地点
是否准许转包或分包
项目信息详述
The National Archives of Ireland holds official State documents and records for preservation. The documents are kept at buildings in Bishop Street, Dublin 8 where there are public reading rooms and storage facilities for the documents. There are two distinct buildings on the site, an office block where the reading rooms, staff offices and some storage are housed and an adjoining warehouse for the storage of the archives. The National Archives will continue to be occupied and operate during the construction period.
The proposed development, comprising approx. gross floor area of 5,200m2, consists of the construction of ground and new first floor archive repository accommodation and circulation areas, with climate control and fire protection. Construction will take place within the existing warehouse walls and roof. The existing floor slab will be removed and replaced by new foundations and floor slab at finished floor level of the existing ground floor. A piling solution is proposed; the completion of the piling design is to be carried out by the piling contractor or specialists. The structure will be a self-supporting in-situ reinforced concrete work. Vertical circulation between ground floor and first floor will be provided via four separate stair cores and two separate lifts. Two of the four stair cores will be continued to the attic space to facilitate maintenance access. Lift access to the attic is not proposed. 
The external works include the replacement of clerestory windows, the widening of an existing escape door and the addition of one escape door, both onto Bride Street. An existing wall with door onto the car park to the East of the warehouse will be widened to accommodate access during the construction period and reversed to reinstate the existing wall and door. A mist suppression tank and associated plant/ equipment shall be provided within the existing car park, complete with new security enclosure. 
联系人:高杨
手机:+86-131-1480-9286
邮箱:gloria.gao@devott.com
微信:13114809286
联系人:张金铭
手机:+86-152-2270-5844
邮箱:angel.zhang@devott.com
微信:15222705844
微信二维码

扫描上方二维码添加联系人咨询

微信二维码

扫描上方二维码添加联系人咨询

版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9

在线咨询

电话咨询

微信咨询