欢迎您访问天津市数字贸易综合服务平台!
当前位置 : 首页 > 市场合作 > 项目信息

市场合作

Market cooperation
项目信息
发包方名称 Maynooth University
发包方国别(国家/地区) 爱尔兰
发包方座机
发包方传真
发包方邮箱
发包方地址 Maynooth Co. Kildare Ireland
发包方网址
发包方联系人姓名 Procurement Office
发包方联系人座机 +353 17084683
发包方联系人手机
发包方联系人邮箱
项目名称 PCO/217 - Provision of Medium Voltage Sub Station Maintenance at Maynooth University North Campus.
项目类型 其他 - 其他
项目预算¥
项目投标截止时间 2022-05-16
项目开始时间
项目结束时间
服务商资质要求
要求高匹配度成功案例个数
项目交付地点
是否准许转包或分包
项目信息详述
The annual service will be carried out to OEM & ESB requirements, and will include but is not restricted to the following. 

Provision of ‘Method Statement/Risk Assessment’ before works commence. 
Injection testing of protection relays, both over-current & earth fault and verification of design consequence. 
Supply, install and commission 2no. OC / EF relay - Main Supply.
Operation testing of local protection on transformers, i.e. alarm and trip circuits on over-temperature and pressure relays. 
Checking MV cable terminations for evidence of heating or discharge. 
Checking of ‘DC APSU’ for ‘stand by’ and operation of local alarms and trips. 
Checking of main LT connections at transformer end of cable run. 
Exercising, lubrication and proving of mechanical operation of MV Circuit Breakers. 
Exercising, lubrication and proving of mechanical operation of MV ‘isolator and/or racking mechanisms. 
Exercising, lubrication and proving of mechanical operation of MV ‘earth switches. 
Visual inspection of ‘circuit breakers’ for gas leaks and/or mechanical damage. 
Replacement of saturated desiccant. 
Cleaning down of switchgear insulating surfaces, voids, and bushings. 
Cleaning down of transformer insulating surfaces, voids, and bushings. 
Visual inspection of ‘ONAN’ transformers for oil leaks and/or mechanical damage. 
Inspection of MV accommodation/plant-rooms for availability of accessories, safety equipment and safe access. 
Make recommendations to bring installation up to industries current ‘best practice’. 
Advise on condition of 20 No. replacement PSU Batteries. Replace where necessary 
The oil transformers can be subjected to ‘Dissolved Gas Analysis’ (DGA). Take samples and have them analysed for DGA and Oil quality. 
Organise and schedule an (upstream) ESB isolation to facilitate the works. The cost of this attendance to be included in the quotation. 
A full report on the overall condition of all associated equipment, control s
联系人:高杨
手机:+86-131-1480-9286
邮箱:gloria.gao@devott.com
微信:13114809286
联系人:张金铭
手机:+86-152-2270-5844
邮箱:angel.zhang@devott.com
微信:15222705844
微信二维码

扫描上方二维码添加联系人咨询

微信二维码

扫描上方二维码添加联系人咨询

版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9

在线咨询

电话咨询

微信咨询