当前位置 : 首页 > 市场合作 > 项目信息市场合作
Market cooperation| 发包方名称 | Mary Immaculate College |
| 发包方国别(国家/地区) | 爱尔兰 |
| 发包方座机 | |
| 发包方传真 | |
| 发包方邮箱 | |
| 发包方地址 | South Circular Road Limerick Limerick Ireland |
| 发包方网址 | |
| 发包方联系人姓名 | Michael Keane |
| 发包方联系人座机 | +353 61204994 |
| 发包方联系人手机 | |
| 发包方联系人邮箱 | |
| 项目名称 | MICTSUM2022 - Mary Immaculate College, St. Patricks College Thurles 2022 Summer Works. |
| 项目类型 | 其他 - 其他 |
| 项目预算¥ | |
| 项目投标截止时间 | 2022-05-10 |
| 项目开始时间 | |
| 项目结束时间 | |
| 服务商资质要求 | |
| 要求高匹配度成功案例个数 | |
| 项目交付地点 | |
| 是否准许转包或分包 | |
| 项目信息详述 | To form a 4 year Multi-Operator work. Works consist of the refurbishment /alteration of existing kitchen area into a new student lounge, including the formation of a new entrance lobby at both entrances, including all necessary demolition works to form a new external door entrance. Allow for the refurbishment of all external sash windows as indicated on the drawings. Allow for the remedial repair works to all internal walls including new stud walls and lining including painting throughout to walls and ceilings. Install new floor coverings over existing terrazzo flooring. With new mechanical and electric works to the area as indicated within service engineers drawings and specification documents. Including new fixed and loose furniture; all as per Architects drawings and specification. External works consist of works to side entrance gate, with new paving to pedestrian areas and all associated line marking and signage. Including new site lighting and associated ductwork as per service engineers drawings and specification; all works as per Architects and Service engineers drawings and specification complete. As the internal works are being carried out within protected structures all works to be carried out in accordance with best conservation practice. Include for all necessary dust screens; Contractor is to note that access to this area is through a shared access with Client which will remain in use by the Client, students and staff throughout the duration of the works and is to be kept clear of all builders materials and kept clean at all times; all as per Architects and Engineers Drawings and specification documents. |
版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9