当前位置 : 首页 > 市场合作 > 项目信息市场合作
Market cooperation| 发包方名称 | Department of Agriculture, Food and the Marine |
| 发包方国别(国家/地区) | 爱尔兰 |
| 发包方座机 | |
| 发包方传真 | |
| 发包方邮箱 | |
| 发包方地址 | Agriculture House Kildare Street Dublin 2 Ireland |
| 发包方网址 | |
| 发包方联系人姓名 | Tom Corkery |
| 发包方联系人座机 | +353 16072165 |
| 发包方联系人手机 | |
| 发包方联系人邮箱 | |
| 项目名称 | Dingle Harbour Expansion Project - Proposed Fishery Harbour Expansion Project at An Daingean Fishery Harbour Centre, Co. Kerry |
| 项目类型 | 其他 - 其他 |
| 项目预算¥ | |
| 项目投标截止时间 | 2022-05-18 |
| 项目开始时间 | |
| 项目结束时间 | |
| 服务商资质要求 | |
| 要求高匹配度成功案例个数 | |
| 项目交付地点 | |
| 是否准许转包或分包 | |
| 项目信息详述 | The Department of Agriculture, Food and the Marine (DAFM) wish to investigate options relating to the expansion of An Daingean Fishery Harbour Centre, Co. Kerry arising from increased fishery related traffic. The ive of the project is to provide adequate berthing facilities at the appropriate draft to meet the future needs of the fleet. Examples of options include deepening and strengthening the east side of the main pier in the harbour or providing new berthing facilities between the rubble mounds on the eastern side of the harbour. The deepening of the navigable channel from 3.1m below Chart Datum to 5.1m below Chart Datum shall also be studied as part of this project. However, DAFM wish to study and fully appraise all potential options to facilitate future expansion of the FHC with respect to increased fishing traffic. Berthing drafts of minimum 6m below Chart Datum are required for large fishing vessels as part of any future expansion works. DAFM are fully committed to ensuring value for money on all of our public works contracts by complying with the Public Spending Code and delivering our projects in accordance with the Capital Works Management work. This commission is for a consultancy firm with expertise in civil and marine engineering with appropriate specialists, where necessary, to undertake the initial appraisal stage in the project life cycle. This includes the preparation of a Preliminary Project Brief, Preliminary Report, Developed Project Brief and, if necessary, a Strategic Assessment Report, if the estimated cost of achieving the ives is likely to exceed 10 million. |
版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9