当前位置 : 首页 > 市场合作 > 项目信息市场合作
Market cooperation| 发包方名称 | Mary Immaculate College |
| 发包方国别(国家/地区) | 爱尔兰 |
| 发包方座机 | |
| 发包方传真 | |
| 发包方邮箱 | |
| 发包方地址 | |
| 发包方网址 | |
| 发包方联系人姓名 | Michael Keane |
| 发包方联系人座机 | +353 61204994 |
| 发包方联系人手机 | +353 872674852 |
| 发包方联系人邮箱 | michael.keane@mic.ul.ie |
| 项目名称 | Art Studio,Chapel Works Summer Works 2022 |
| 项目类型 | 其他 - 其他 |
| 项目预算¥ | |
| 项目投标截止时间 | 2022-06-13 |
| 项目开始时间 | |
| 项目结束时间 | |
| 服务商资质要求 | |
| 要求高匹配度成功案例个数 | |
| 项目交付地点 | |
| 是否准许转包或分包 | |
| 项目信息详述 |
Chapel Works: Works consist of removal and replacement of existing cast iron gutters, cleaning down and painting section of external wall. Replacement of small flat roof finish. Lime plaster finish to damaged walls internal including painting; all as per Architects Drawings and specification. Contractor is to maintain safe access through the existing road and existing pedestrian access routes for the College throughout the duration of the works. As the works are being carried out within protected structures all works to be carried out in accordance with best conservation practice. Include for all necessary dust screens; Contractor is to note that access to this area is through a shared access with Client which will remain in use by the Client, students and staff throughout the duration of the works and is to be kept clear of all builders materials and kept clean at all times; all as per Architects and Engineers Drawings and specification documents.The works are sited within Mary Immaculate College Campus within a live / populated campus within a constrained working environment. Throughout the course of the project works, M.I.C. intends to continue and carry out normal day to day academic and other activities. Contractor is to note that there will be Noise restrictions including out of hours work required. Deliveries & Waste Removal at permitted times only and to be arranged with campus management and needs to be identified in Waste Management Plan. Contractor to allow for a liaison officer in order to liaise with staff regarding any works carried out within the occupied portion of the building. Art Studio Conversion Works: Works consist of Stripping out existing Art gallery, new external windows and doors, Including a full refurbishment internally converting the space into a two bedroom living quarters inclusive of all new mechanical and electrical works and new finishes throughout. Including all associated site works; all as per Architects and engineers drawings.
|
版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9