欢迎您访问天津市数字贸易综合服务平台!
当前位置 : 首页 > 市场合作 > 项目信息

市场合作

Market cooperation
项目信息
发包方名称 Christ the Saviour National School
发包方国别(国家/地区) 爱尔兰
发包方座机
发包方传真
发包方邮箱
发包方地址 Ballingarry Co.Limerick Ballingarry Ireland
发包方网址
发包方联系人姓名 Rebecca Cleary
发包方联系人座机
发包方联系人手机 +353 6968402
发包方联系人邮箱 ballingarryns@yahoo.ie
项目名称 M&E Upgrade Emergency Works Ballingarry NS Co Limerick
项目类型 工程机械维修维护服务 - 工程机械维修维护服务
项目预算¥
项目投标截止时间 2022-06-07
项目开始时间
项目结束时间
服务商资质要求
要求高匹配度成功案例个数
项目交付地点
是否准许转包或分包
项目信息详述
The mechanical services upgrade scope of the works includes the following:
a) De-commission, isolate, drain down, remove and dispose of the redundant oil fired boiler the main boiler room and all associated header pipework and services including the oil storage tank and any remaining heating oil to a licenced waste recycling facility. 
b) De-commissioning, Isolation, drain down, removal and disposal of the redundant heating distribution system and associated services to a licenced waste facility. 
c) Convert the heating system fuel supply to LPG as the fuel source, construction of a new gas tank storage compound and connection of the new gas service to the boiler room.
d) Supply and installation of a new gas fired cascade boilers system, flue system and gas safety systems
e) Replacement of the heating centre pipe work, valves, actuators, pumps and controls etc with new services to suit the new boiler room layout 
f) Supply of a new packaged pressurisation unit and expansion vessel and associated controls
g) New heating distribution pipework and radiator systems throughout the school
h) Controls upgrade to provide new two port motorised valves and room thermostats to individual classrooms, circulation areas and offices to provide independent local control.   
i) New heating system control panel with BMS and all associated controls and provide a new user interface located in the principal’s office together with a simple boost facility control panel and remote access via smart phone app.
j) Supply and install a new indirect calorifier and associated controls and pumps and reconnect to the existing distribution pipework system with secondary return to serve the school with hot water.
k) All associated electrical works including isolations disconnections and strip out and new power and controls cabling run in galvanised steel containment systems to serve the new heating system 
l) All associated builders works including removal of the boiler and plinth, and clean out of 
联系人:高杨
手机:+86-131-1480-9286
邮箱:gloria.gao@devott.com
微信:13114809286
联系人:张金铭
手机:+86-152-2270-5844
邮箱:angel.zhang@devott.com
微信:15222705844
微信二维码

扫描上方二维码添加联系人咨询

微信二维码

扫描上方二维码添加联系人咨询

版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9

在线咨询

电话咨询

微信咨询