当前位置 : 首页 > 市场合作 > 项目信息市场合作
Market cooperation| 发包方名称 | Donegal County Council |
| 发包方国别(国家/地区) | 爱尔兰 |
| 发包方座机 | |
| 发包方传真 | +353 749172812 |
| 发包方邮箱 | |
| 发包方地址 | County House Lifford Co Donegal Ireland |
| 发包方网址 | |
| 发包方联系人姓名 | Jim Doherty |
| 发包方联系人座机 | |
| 发包方联系人手机 | +353 749153900 |
| 发包方联系人邮箱 | info@donegalcoco.ie |
| 项目名称 | Burtonport Quay Wall - Civil Design Consultancy Service to design quay wall repairs and additional works |
| 项目类型 | 其他 - 其他 |
| 项目预算¥ | |
| 项目投标截止时间 | 2022-05-27 |
| 项目开始时间 | |
| 项目结束时间 | |
| 服务商资质要求 | |
| 要求高匹配度成功案例个数 | |
| 项目交付地点 | |
| 是否准许转包或分包 | |
| 项目信息详述 |
Donegal County Council proposes to appoint a design consultant to develop the preliminary piled wall design solution identified in the above report through the detailed design , tender action, construction supervision and handover stages as identified in the Form of Tender and Schedule document provided. It is proposed that these works would be delivered under phase 1 on the development.
Under this appointment Donegal County Council would request that the consultant also develops a design solution for the area identified to the east of phase 1 including the widening and lengthening of the existing slipway and construction of a bank seat to accommodate a future pontoon development, shown on the attached Tender Plan in the Information Folder, as phase 2 of the development. It is hoped that by completing the design of phases 1 and 2 concurrently that continuity in design approach can be achieved. It is envisaged that phase 2 will be delivered later than phase 1, subject to funding.
|
版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9