当前位置 : 首页 > 市场合作 > 项目信息市场合作
Market cooperation| 发包方名称 | Mayo County Council |
| 发包方国别(国家/地区) | 爱尔兰 |
| 发包方座机 | |
| 发包方传真 | |
| 发包方邮箱 | |
| 发包方地址 | Aras an Chontae Castlebar Co. Mayo Ireland |
| 发包方网址 | |
| 发包方联系人姓名 | John Maughan |
| 发包方联系人座机 | |
| 发包方联系人手机 | +353 949047349 |
| 发包方联系人邮箱 | jmaughan@mayococo.ie |
| 项目名称 | Housing Development Westport - Proposed 50 Unit Housing Development at Golf Course Road, Westport, Co Mayo - A578 |
| 项目类型 | 其他 - 其他 |
| 项目预算¥ | |
| 项目投标截止时间 | 2022-06-07 |
| 项目开始时间 | |
| 项目结束时间 | |
| 服务商资质要求 | |
| 要求高匹配度成功案例个数 | |
| 项目交付地点 | |
| 是否准许转包或分包 | |
| 项目信息详述 |
Construction of a new social housing development at Golf Course Road on the outskirts of Westport, Co. Mayo. The site is adjacent to Westport House grounds to the north west & an existing housing development & industrial building to the north east of the site. Westport Utd Football grounds & a public playground are located to the south west of the site.
The construction of 50 no. dwellings, all provided with private gardens & associated carparking. Associated site development works include access roads, footways, greenway, site boundaries, open space, drainage, landscaping, associated earthworks, public lighting, utilities & services connections, diversions of services & ancillary works including:
- Removal of existing fencing & planting to provide access to the site.
- Construction of 50no new dwelling units, constructed as terraced or semi-detached blocks comprising:
o 14 No. Semi Detached 2 Bed (4 person) two storey units
o 36 No. Terraced / Semi Detached 3 Bed (6 person) two storey units
- Construction of new development entrance, access roads & builder’s compound.
- Site clearance including removal of existing trees & shrubs & bulk excavation to reduce site levels generally.
- Removal of material excavated from site to a licenced landfill facility.
- Redistribution of material excavated from site.
- Construction of new sloping earthen embankments.
- A mixture of plastered block walls, timber palisade & chain fences to boundaries of the site.
- Stonework boundary walls to the front of the houses
- A mixture of plastered block walls & timber palisade fences constructed between gardens
- Site development & surfacing work including roads, paths & pavings to tie into & continue on the existing public roads & paths
- Diversion of existing ESB lines & New Electricity Substation
- New connections to public utilities including Electricity, Telecoms, Water, Sewers, Storm drainage along with the provision of new street lighting & outlet ducts for EV charging.
|
版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9