欢迎您访问天津市数字贸易综合服务平台!
当前位置 : 首页 > 市场合作 > 项目信息

市场合作

Market cooperation
项目信息
发包方名称 Department of the Environment, Climate and Communications
发包方国别(国家/地区) 爱尔兰
发包方座机
发包方传真
发包方邮箱
发包方地址 29-31 Adelaide Road Dublin 2 Dublin Ireland
发包方网址
发包方联系人姓名 Susan Fleming
发包方联系人座机
发包方联系人手机 +353 16783178
发包方联系人邮箱 susan.fleming@decc.gov.ie
项目名称 A study and report analysing the impacts of increased electricity interconnection on achievement of Ireland’s 2030 and post 2030 climate and energy objectives
项目类型 其他 - 其他
项目预算¥
项目投标截止时间 2022-06-30
项目开始时间
项目结束时间
服务商资质要求
要求高匹配度成功案例个数
项目交付地点
是否准许转包或分包
项目信息详述
To incentivise further future electricity interconnection with neighbouring countries/markets, the Programme for Government and Climate Action Plan commit DECC to updating Ireland’s existing interconnector policy. Action 110 of the Climate Action Plan 2021 further requires that this update must take place by Q4 2022. 
DECC International and Offshore Energy division will update the interconnection policy via two principle workstreams: 1) Public Consultation; 2) Procuring an external energy consultancy to conduct a study into the impact of increased interconnection on achieving Ireland’s increased climate and energy ambition, which will form the evidence for updating Government’s existing policy.
The scope of the proposed study includes an assessment of: 
• The impact, including economic and climate rationale, for developing further interconnection beyond the proposed Celtic and Green interconnectors, on achieving Ireland’s 2030 and post 2030 climate and energy ives.
• The extent to which clear signalling by Government on delivery of future interconnection capacity would impact delivery of 80% renewable electricity, including 5 GW of ORE, by 2030, and the longer-term ive of achieving net zero by 2050.
• To include consideration of the impact of further interconnection on de-risking renewables development, system operation and security of supply, in the context of Ireland’s energy and climate ives. 
• The extent to which further interconnection can contribute to the decarbonisation of Irish power generation and electricity consumed in Ireland, by replacing domestic fossil fuel generation. 
• The impact of further interconnection on total power system costs. 
• Consideration of the optimal countries/markets for Ireland to interconnect with, and whether priority should be placed on developing further interconnection with Great Britain or the EU IEM. 
联系人:高杨
手机:+86-131-1480-9286
邮箱:gloria.gao@devott.com
微信:13114809286
联系人:张金铭
手机:+86-152-2270-5844
邮箱:angel.zhang@devott.com
微信:15222705844
微信二维码

扫描上方二维码添加联系人咨询

微信二维码

扫描上方二维码添加联系人咨询

版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9

在线咨询

电话咨询

微信咨询