当前位置 : 首页 > 市场合作 > 项目信息市场合作
Market cooperation| 发包方名称 | Westmeath County Council |
| 发包方国别(国家/地区) | 爱尔兰 |
| 发包方座机 | |
| 发包方传真 | +353 449342330 |
| 发包方邮箱 | |
| 发包方地址 | Áras An Chontae, Mountstreet, N91 FH4N Mullingar County Westmeath Ireland |
| 发包方网址 | |
| 发包方联系人姓名 | Senior Executive Officer |
| 发包方联系人座机 | |
| 发包方联系人手机 | +353 449332000 |
| 发包方联系人邮箱 | secretar@westmeathcoco.ie |
| 项目名称 | Integrated Design Team to deliver the design of a 10,000 sq. m. Advanced Building Solution through the Planning Process |
| 项目类型 | 其他 - 其他 |
| 项目预算¥ | |
| 项目投标截止时间 | 2022-06-28 |
| 项目开始时间 | |
| 项目结束时间 | |
| 服务商资质要求 | |
| 要求高匹配度成功案例个数 | |
| 项目交付地点 | |
| 是否准许转包或分包 | |
| 项目信息详述 |
Westmeath Innovation & Enterprise Designated Activity Company (WDAC) has selected a site within Ardmore, Mullingar as a suitable location for a new technology unit for the delivery of a c. 10,000 sq. m. Advanced Building Solution with 100% expansion capability and maximum flexibility in terms of its design.
WDAC intends to engage an Integrated Design Team to deliver the project. The consultant shall appoint a Project Manager from the lead tenderers personnel for the scheme, and he/she shall have overall responsibility for the management, delivery and implementation of the discrete stages as set out below:
• Stage (i) Project Inception Investigations and Concept Design,
• Stage (ii) Preliminary Design and Statutory Planning
A full deion of the services required by the Client is provided in Schedule B of the Tender and Schedule for the Conditions of Engagement for Consultancy Services (Technical).
|
版权所有:天津市数字贸易综合服务平台 备案号:津B2-20080229-9