post-dorian beach renourishment project • approximately 23,500 linear feet of beach fill in nags head from beach stations 790+00 to 1025+00. dredging by hopper or hydraulic pipeline dredge from offshore designated borrow areas, transport, placement and gr
purchase of medical and hospital material for general use (puncture, perfusion, catheters, equipment, spirometry and others), with lending of volumetric infusion pumps for equipment and syringe pumps infusion syringe - 1 needle,6 cannula,7 hypodermic need
joint mecklenburg county afm & charlotte/mecklenburg storm water services project. scope of work includes: +/-1.5 miles of new greenway construction, the rehabilitation of 2,340 lf of stewart creek tributary 2, and a 2.3 acre wetland stormwater control me
①Internet Protocol Private Branch Exchange (E74i), Quantity is undecided,②Fixed Digital Equipment for Satellite Communication (Type 2), Quantity is undecided.,③Fixed type Automatic Pursuit Receiver for Digital Helicopter Television (Type 2), Quantity is u