supply of mg special point and crossing oil treated garjon wooden sleeper for regular maintenance of track under den-1-ctg section of bangladesh railway
at ssae-way-slhr section: maintenance of mg track including ballasting mechanical tamping replace of damaged spl wooden sleeper installation of check rail recoupment of short fittings at slhr-jnht section from km 7/1 - 13/0 = 5.90 km (main line) & loop l
supply of cable with laying shifting of signal post track circuit point machine and modification of software due to increase of csl of 3rd line extension at bangabandhu hightech city railway station.
extension of csl of loop line no.3 at jamtoil loop line no.1 at lahirimohonpur loop line no.1 & 3 at bhangura and loop line no.1 at muladuli station including construction of ballast wall and other ancillary works under divisional engineer/2/paksey's jur
civil works including with repair and change of existing acâ??s installation of new acâ??s in prepayment vending center 33/11kv substation control rooms and office building under sales and distribution division-2 bpdb sylhet.